pumps project at Yamama Cement Factory
• Supply, installation and installation of three three sets of speed control units for speed.
• Designing and realizing the well supply network from the medium voltage line and the 11/0.69 kV step-down transformers
• The work of the water transmission network from the three wells to the water station.
• Design and construction of the three wells chambers.
Location / North Halal 120 km south of Riyadh
Owner / Yamama Cement Company
![Slide#1](http://alalah.com/wp-content/uploads/2023/10/Slide1.jpg)
![](http://alalah.com/wp-content/uploads/2023/10/caption.png)
![Slide#2](http://alalah.com/wp-content/uploads/2023/10/Slide2.jpg)
![](http://alalah.com/wp-content/uploads/2023/10/caption.png)
![Slide#3](http://alalah.com/wp-content/uploads/2023/10/Slide3.jpg)
![](http://alalah.com/wp-content/uploads/2023/10/caption.png)
![Slide#4](http://alalah.com/wp-content/uploads/2023/10/Slide4.jpg)
![](http://alalah.com/wp-content/uploads/2023/10/caption.png)
![سلايد-سكالا1 سكالا1 مضخة سكالا1](http://alalah.com/wp-content/uploads/2023/11/سلايد-سكالا1.jpg)
![](http://alalah.com/wp-content/uploads/2023/10/caption.png)
![Pumps Project at Yamama Cement Factory Slide](http://alalah.com/wp-content/plugins/revslider/public/assets/assets/transparent.png)
![Pumps Project at Yamama Cement Factory Slide](http://alalah.com/wp-content/plugins/revslider/public/assets/assets/transparent.png)