pumps project at Yamama Cement Factory
• Supply, installation and installation of three three sets of speed control units for speed.
• Designing and realizing the well supply network from the medium voltage line and the 11/0.69 kV step-down transformers
• The work of the water transmission network from the three wells to the water station.
• Design and construction of the three wells chambers.
Location / North Halal 120 km south of Riyadh
Owner / Yamama Cement Company











